RM新时代注册-首页

<rt id="vkikc"><nobr id="vkikc"></nobr></rt>
  • <rp id="vkikc"><center id="vkikc"></center></rp>
      <menuitem id="vkikc"><option id="vkikc"><font id="vkikc"></font></option></menuitem>

      <nav id="vkikc"></nav>

      <rp id="vkikc"><center id="vkikc"></center></rp>

      1. 雙組份打膠機重要的兩個(gè)部分的操作!

        時(shí)間:2021-02-19 來(lái)源:http://whooo.net/ 發(fā)布人:昌盛機械

        雙組份打膠機的操作過(guò)程十分的簡(jiǎn)單,小編大概總結下分為兩個(gè)部分一個(gè)是控制系統的操作,另一個(gè)就是膠桶的安裝/更換,具體點(diǎn)的方法如下。
        The operation process of the two-component gluing machine is very simple. It can be divided into two parts. One is the operation of the control system, and the other is the installation / replacement of the glue barrel. The specific methods are as follows.
        ①控制系統操作方法
        ① Operation method of control system
        1.接通電源(380V 三相四線(xiàn))和氣源(0.6-0.7MPa)。
        1. Connect the power supply (380V three-phase four wire) and air source (0.6-0.7mpa).
        2.打開(kāi)A,B膠供膠閥門(mén),關(guān)閉B膠回流閥門(mén)。
        2. Open the glue supply valve of a and B glue and close the glue return valve of B glue.


        3.在控制面板上選擇“開(kāi)機”然后檢查一下A,B膠是否工作正常。此時(shí)供膠機混膠工作準備就緒。
        3. Select "power on" on the control panel and check whether glue a and B work normally. At this time, the mixing work of the glue feeder is ready.
        4、如果長(cháng)時(shí)間不用(超過(guò)15分鐘)或者是下班時(shí)要在控制面板上選擇“沖槍”,然后打開(kāi)B膠回流閥門(mén),關(guān)閉B膠供膠閥門(mén).此時(shí)供膠機沖槍準備工作就緒。
        4. If you don't use it for a long time (more than 15 minutes) or when you are off duty, you should select "flushing gun" on the control panel, then open the B glue return valve and close the B glue supply valve. At this time, the flushing gun of the glue feeder is ready.
        5、每次操作前確保設備的水平度,調整機器的水平度,調節地腳的高度使機身水平。
        5. Before each operation, ensure the levelness of the equipment, adjust the levelness of the machine, and adjust the height of the foundation to make the fuselage level.
        6、接通電源后先檢查各電機的旋轉方向是否正確,接通與CL—A—01打膠機的膠管、信號。(注意:A膠提膠齒輪泵電機的旋轉方向必須符合齒輪泵旋轉方向)
        6. After the power is turned on, check whether the rotation direction of each motor is correct, and connect the hose and signal of cl-a-01 glue machine. (Note: the rotation direction of a glue lifting gear pump motor must conform to the rotation direction of gear pump)
        ②膠桶的安裝/更換
        ② Installation / replacement of rubber barrel
        1、在控制面板上選擇“AB膠壓盤(pán)”。
        1. Select "AB glue pressure plate" on the control panel.
        2、再選擇“A膠升”此時(shí)A膠壓盤(pán)上升。
        2. Then select "a glue up" and the a glue pressure plate will rise.
        3、高度到位時(shí)在控制面板上選擇“A膠停”
        3. When the height is in place, select "a glue stop" on the control panel
        4、將A膠桶放到壓盤(pán)下面,打開(kāi)桶蓋將里面的膠袋固定好,將膠桶的上口與壓盤(pán)對齊(注意:新機器或是剛換上的密封圈是要先將密封圈外表涂上A膠,以便起到潤滑作用)。
        4. Put a rubber barrel under the pressure plate, open the lid of the barrel, fix the inner plastic bag, and align the upper opening of the rubber barrel with the pressure plate (Note: for new machine or newly replaced sealing ring, first coat a rubber on the surface of the sealing ring, so as to play a lubricating role).
        5、打開(kāi)A膠壓盤(pán)上的排氣閥,然后再選擇“A膠降”,此時(shí)A膠壓盤(pán)下降,等壓盤(pán)快要降到桶口時(shí)停止下降,檢查壓盤(pán)是否對齊桶口,調整膠桶的位置對齊為止。
        5. Open the exhaust valve on the pressure plate of glue a, and then select "glue a drop". At this time, the pressure plate of glue a will drop. Stop falling when the pressure plate is about to drop to the mouth of the barrel. Check whether the pressure plate is aligned with the mouth of the barrel, and adjust the position of the barrel until it is aligned.
        6、讓壓盤(pán)斷續下降(即A膠降→A膠停→A膠降---),當壓盤(pán)壓入桶內時(shí)可使壓盤(pán)連續下降,此時(shí)排氣閥內有空氣排出,當排氣閥內連續排出A膠而沒(méi)有空氣排出時(shí),壓盤(pán)停止下降并關(guān)閉閥門(mén)。
        6. Let the pressure plate drop intermittently (i.e. a glue drop → a glue stop → a glue drop -). When the pressure plate is pressed into the barrel, it can make the pressure plate drop continuously. At this time, air is discharged from the exhaust valve. When a glue is continuously discharged from the exhaust valve but no air is discharged, the pressure plate stops falling and the valve is closed.
        7、此時(shí)A桶安裝完成,達到工作準備狀態(tài)。B膠桶安裝方法同A膠安裝方法。
        7. At this time, the installation of barrel a is completed and the work is ready. The installation method of B glue barrel is the same as that of a glue barrel.

        聯(lián)系我們Contact us

        • 咨詢(xún)熱線(xiàn):0531-85717458 13705446998
        • 公司地址: 山東省德州市齊河安頭鄉企巢工業(yè)園
        • 掃碼聯(lián)系我們:

        截屏,微信識別二維碼

        微信號:13705446998

        // RM新时代注册-首页

        <rt id="vkikc"><nobr id="vkikc"></nobr></rt>
      2. <rp id="vkikc"><center id="vkikc"></center></rp>
          <menuitem id="vkikc"><option id="vkikc"><font id="vkikc"></font></option></menuitem>

          <nav id="vkikc"></nav>

          <rp id="vkikc"><center id="vkikc"></center></rp>

          1. <rt id="vkikc"><nobr id="vkikc"></nobr></rt>
          2. <rp id="vkikc"><center id="vkikc"></center></rp>
              <menuitem id="vkikc"><option id="vkikc"><font id="vkikc"></font></option></menuitem>

              <nav id="vkikc"></nav>

              <rp id="vkikc"><center id="vkikc"></center></rp>

              1. RM平台 rm新时代靠谱吗 RM新时代投资安全吗 RM新时代是正规平台吗 RM新时代资金盘