雙組玻璃打膠機要注意的事項
時(shí)間:2018-09-03 來(lái)源:http://whooo.net/ 發(fā)布人:昌盛機械
1、停電時(shí)馬上到機器后邊交流正在運用的排膠閥氣管后,手動(dòng)按動(dòng)白膠電磁閥使氣泵上下運動(dòng)排膠到全白膠時(shí)中止。氣管接回原處,完畢。
1. When the power is cut off, immediately go to the back of the machine to exchange the drain valve air pipe being used, then manually press the white glue solenoid valve to make the air pump move up and down to drain glue to stop when it is all white glue. The trachea is back to its original location.
2、出產(chǎn)時(shí)需求把玻璃里邊一張標簽撕掉或貼到玻璃的下方,防止光電感應開(kāi)關(guān)感應到誤動(dòng)作損壞膠頭。在主動(dòng)狀況時(shí)留意不要用手或其他異物遮擋光電開(kāi)關(guān),有問(wèn)題時(shí)及時(shí)按下急停開(kāi)關(guān)或封閉電源。
2. When producing, a label inside the glass should be torn off or pasted to the bottom of the glass to prevent the photoelectric induction switch from causing damage to the glue head. Be careful not to shield the photoelectric switch with hand or other foreign body when in active condition. Press the emergency shutdown switch or close the power supply when there is a problem.
3、下班時(shí)需求整理膠頭,首要封閉連線(xiàn),把旋轉開(kāi)關(guān)旋轉到清洗和手動(dòng)狀況,按下排膠發(fā)動(dòng)鍵,再按排膠閥鍵,這時(shí)膠頭出膠,翻開(kāi)黑膠減壓閥發(fā)排壓,降下壓力后封閉擰緊,待膠頭出膠全是白膠后按下排膠閥鍵,距離5秒左右再次按下排膠閥鍵降白膠壓力,待壓力降到1以下封閉排膠閥?!峨p系統》留意:泄黑膠壓力時(shí)有必要把兩組黑膠壓力都泄完。
3. Need to tidy up the rubber head when off-duty, the first closed connection, the rotary switch to the cleaning and manual conditions, press the glue discharge start key, and then press the glue discharge valve key, when the glue head glue, open the black glue pressure relief valve hair discharge pressure, pressure reduction after sealing tighten, until the glue head is all white glue after pressing the glue discharge valve key, the distance of about 5 seconds Press the rubber drain button again to reduce the pressure of the white glue and close the rubber drain valve until the pressure drops below 1. Double system notice: it is necessary to release two groups of black rubber pressure when discharging black gum pressure.
4、每條邊的打膠狀況可通過(guò)工藝里邊的向上調整,上部調整,向下調整,底部調整來(lái)恰當調整,每次調整需保存。
4. The gluing condition of each edge can be properly adjusted by the up adjustment, the upper adjustment, the down adjustment and the bottom adjustment in the process. Each adjustment needs to be preserved.
5、半途需求替換玻璃厚度或綠條厚度時(shí),待出產(chǎn)前次規格玻璃終一張玻璃時(shí)封閉連線(xiàn),打完終一張玻璃進(jìn)入輸出端停下時(shí)轉到手動(dòng)狀況,進(jìn)入玻璃厚度界面設置需求的玻璃厚度或綠條厚度,設置完結今后連線(xiàn)主動(dòng)出產(chǎn)。
5. When the glass thickness or green strip thickness is needed to be replaced halfway, the final glass of the previous specification will be closed when the connection is finished. When the final glass enters the output terminal and stops, it will change to manual condition. When the glass thickness interface is set, the required glass thickness or green strip thickness will be set. After the connection is finished, the production will be initiated.
6、需求排膠時(shí)先封閉連線(xiàn),待打膠的玻璃打完并移動(dòng)到輸出端今后按下排膠發(fā)動(dòng)按鈕,再按排膠閥。這時(shí)需求持續出產(chǎn)就需求把設備旋轉到手動(dòng)狀況,按下連線(xiàn)按鈕,再次轉到主動(dòng)狀況,按下主動(dòng)運行按鈕持續出產(chǎn)。
6. Close the connection before discharging glue, press the discharging button and then the discharging valve when the glass is finished and moved to the output end. At this time the demand for continuous production on the need to rotate the equipment to manual status, press the connection button, again to the active status, press the active operation button to continue production.
7、打膠時(shí)若膠頭剩余膠較多時(shí)需及時(shí)整理,整理時(shí)留意防止輔佐傳送傷手,玻璃平整度欠好時(shí)需求用手輔佐玻璃,有必要使檢測器在兩片玻璃之間移動(dòng)。
7. When gluing, if there is more glue left in the head, it is necessary to tidy it up in time. When tidying, it is necessary to pay attention to the safety of assistant transmission of injured hands. When glass flatness is not good, it is necessary to use hand-assisted glass to make the detector move between two pieces of glass.
(濟南昌盛機械,對雙組份打膠機感興趣的朋友可以關(guān)注我們http://linshi.jncsjx.com,敬請期待更多精彩內容,謝謝!)
(Jinan Changsheng Machinery, the two-component glue beater interested in friends can pay attention to our http://linshi.jncsjx.com, please look forward to more exciting content, thank you!
- 中空玻璃生產(chǎn)線(xiàn)有哪些設備組成 2024/06/13
- 丁基涂布機的膠嘴漏膠會(huì )不會(huì )營(yíng)銷(xiāo)生產(chǎn)質(zhì)量? 2024/06/13
- 雙組份打膠機的結構原理介紹 2024/06/11
- 中空玻璃設備變速裝置的作用 2024/06/09
- 玻璃涂布機設備的涂布速度會(huì )因為溫度變化而產(chǎn)生影響 2024/06/07
- 鋁條折彎機的設備組成介紹 2024/06/06
- 玻璃涂布機設備的使用流程 2024/05/28
- 全自動(dòng)封膠線(xiàn):封膠機的種類(lèi)有哪些? 2024/05/24
- 玻璃涂布機設備的使用流程 2024/05/23
- 立式丁基膠涂布機的分類(lèi)以及工作原理 2024/05/22
產(chǎn)品分類(lèi)Product categories
聯(lián)系我們Contact us
- 咨詢(xún)熱線(xiàn):0531-85717458 13705446998
- 公司地址: 山東省德州市齊河安頭鄉企巢工業(yè)園
- 掃碼聯(lián)系我們: